Calculating Method of Minimum Load-Shedding Cost in Transmission Network Planning

JIN Hua-zheng,CHENG Hao-zhong,ZHAI Hai-bao
DOI: https://doi.org/10.3969/j.issn.1003-8930.2005.06.002
2005-01-01
Abstract:The transmission network planning under power market enviroment should consider the investment,operating and load-shedding cost synthetically,so it is necessary to calculate the minimum load-shedding cost of transmission alternatives.In this paper a load-shedding mathematical model is established whose objective is to minimize the load-shedding cost,and then a calculating method of gradual economic load-shedding is presented to solve the model.The method is a iterative process of eliminating system overloads gradually.In each iteration,an economic efficiency index is introduced to take into account both the load-shedding efficiency and unit load-shedding cost for each bus,and then the optimal load-shedding bus and its load-shedding quantity is chosen.When all system overloads are cleared up,the iteration is stopped.Thus the sum of load-shedding cost in all load-shedding buses is determined as the minimum load-shedding cost of the system.A calculating example demonstrates that the method is efficient,operable and coincides well with the actual situation under the power market.
What problem does this paper attempt to address?