Power source planning method satisfying unit cost recovery constraints under market environment

TIAN Xichen,GUO Hongye,LI Kexin,HUANG Junling,CHEN Qixin
DOI: https://doi.org/10.16081/j.epae.202303030
2023-01-01
Abstract:In order to ensure the system power generation capacity adequacy in the planning period,a power source planning method satisfying unit cost recovery constraints is proposed under the market environment.The unit cost recovery constraint is derived based on the market price signal and capacity compensation mechanism,which is embedded into the power source planning model,and a two-layer model coupling with the power source planning and electricity market. The Benders decomposition algorithm is used to solve the model,which solves the problem that the traditional upper-and lower-level iteration solution methods cannot guarantee the global optimal solution. The example results of IEEE RTS-96 system verify the effectiveness of the proposed model and method.