Analysis on Ultimate Load Bearing Capacity of Zhangzhou Combat Readiness Bridge

Zhang Lianzhen
2010-01-01
Journal of Highway and Transportation Research and Development
Abstract:Partially cable-stayed bridge is a new kind of bridge lies in between continuous beam bridge and cable-stayed bridge.Zhangzhou Combat Readiness Bridge,the first concrete partially cable-stayed bridge in China,was chosen to analyze the ultimate bearing capacity of partially cable-stayed bridge.The material of concrete and steel was supposed to be an ideal elastic-plastic material and multi-linear isotropic hardening material which adopt Drucker-prager and Mises yield criterion separately.The UL formula considering geometrical nonlinearity and material nonlinearity was used in finite element model by using ANSYS software and the full-range analysis method based on nonlinear continuum mechanics.The analyses indicate that(1) the nonlinear characteristic of partially cable-stayed bridge is not evident when the live load factor λ is less than 3;(2) the material strength exceeds the ultimate strength when the ultimate load bearing capacity of partially cable-stayed bridge is reached,and the destabilization phenomena does not appear;(3) the material nonlinearity of concrete is the main factor affecting the ultimate load bearing capacity of partially cable-stayed bridge;(4) the load bearing capacity is minimum when the load is disposed on midspan,and the live load factor λ is 7.8 and the ultimate safety factor k is 1.78.
What problem does this paper attempt to address?