Evaluation of monetary of comprehensive benefits of water conservancy project——A case of Phase-II of Yangtze River Course Training in Nanjing City

Huang Xianjin,Gao Minyan,Li Taozhang
DOI: https://doi.org/10.3969/j.issn.1000-1123.2012.16.021
2012-01-01
Abstract:In China,post project evaluation of water conversancy project concentrates more on its direct benefits to national economy,but lacks of study on monetary aspect of its comprehensive benefits.A case study is conducted for monetarise the comprehensive benefits of Phase-II of Yangtze River Course Training in Nanjing City.A post evaluation index system with three factors of economic,social and ecological benefits is built.Evaluation method and matrix of post evaluation after benefit monetarising are defined on the basis of separating direct and indirect economic benefits and social and ecological benefits.The result shows that the comprehensive benefits of this project reaching to 2.192 billion yuan which is 5.03 times of the actual investment,among which non flood control benefit is six times of flood control benefit.It is found that the extending benefits of water conservancy project have long been ignored.Thus it is suggested to complete the Interim Provisions of Post Project Evaluation of large Water Conservancy Project and Guidelines for Preparation of Post Project Evaluation Report of large Water Conservancy Project,make more studies on investment recovery mechanism and conduct planning and programming of river course training and water project construction in a scientific manner.
What problem does this paper attempt to address?