Flowshop Problem to Minimize Total Completion Time with A Learning Effect

SUN Lin-hui,WANG Dan,WANG Ji-bo
2011-01-01
Abstract:In this paper we consider a two-machine flowshop scheduling problem with a learning effect.The learning effect of a job is assumed to be an exponent function of its position.The objective is to find a sequence that minimizes the total completion time.A mathematical programming model is developed for the problem.and three heuristic algorithms are proposed for solving the problem with large scale.Compuational results show that the proposed heuristic algorithms are effective in solving the problem with large scale.
What problem does this paper attempt to address?