Time Scale Distortion in a Movable-Bed Unsteady Flow Test and Its Improvement Methods

邵学军,李俊凯,王睿禹
DOI: https://doi.org/10.3969/j.issn.1003-1243.2007.06.019
2007-01-01
Abstract:The time scale distortion is the main factor that affects the precision and reliability of the movable-bed models in case of unsteady flow.This paper presents a case study on the time scale distortion problems in the physical model for the sluicing of the navigation channel upstream of the Three Goreges Dam.The impact of time scale distortion is analyzed.The time length of unsteady flow is identified in a preparatory hydraulic experiment,based on which a method to improve the precision of the test results is proposed.By conditionally modifying the time scale,the time length of steady flow in the model could better represent the process in the prototype.Extending the total length of sediment flushing time can make up for the reduction of effective flushing time and thereby enhance the similarity of sediment flushing process between the model and the prototype.
What problem does this paper attempt to address?