Long Term Hydropower Optimal Operation Model With Electric Power Transmission Restrictions for Absorbed Energy Maximization

WU Xinyu,CHENG Chuntian,WANG Jing,Hongbing Tang,LI Chonghao
2011-01-01
Abstract:The optimal operations for hydropower systems covering multi provinces and multi basins have become bottlenecks of large scale hydropower system of China.A long term optimal operation model for absorbed energy maximization of hydropower systems was proposed for the hydropower system of China southern power grid(CSG).Based on the energy maximization model,absorbing capacity of power grids and limitation of electric transmission among interconnected power grids were involved in the model to meet the real operation demands of large scale hydropower operations.Progressive optimality algorithm,discrete differential dynamic programming and successive approximation method were combined to solve the model.Case study for a 92 hydropower plants system of CSG shows that the model can satisfy the requirements and confines about long term energy transmission inter provincial power grids,and is suitable for long term hydropower operation problems with large scale inter grids power transmission.
What problem does this paper attempt to address?