Research on existing bridge-culvert using of reconstruction project

BAI Jian-jun
DOI: https://doi.org/10.3969/j.issn.1005-0574.2011.05.009
2011-01-01
Abstract:The Xihai overpass to Leconghe village section pavement of the highway of Sanshui to Lecong is a bi directional and four lane highway,but in which both ends of it is the two-way six lanes highway,which cause the traffic capacity do not match,and need rebuilding.There are structures around the old road,considered from the economic,environmental protection,security and so on various aspects,put forward the reinforcement and using measures of existing structure,provide the reference for similar projects.