Analysis and Evaluation of Electric Power Enterprise Operation Outsourcing Risk Based on Fuzzy-AHP

俞璇,杨育,文颖,张峰,赵川
DOI: https://doi.org/10.3969/j.issn.1006-0316.2010.06.012
2010-01-01
Abstract:Electricity power enterprises operation and maintenance outsourcing is a new business management model,its main purpose is to outsource the plant operation and maintenance to professional operators so as to reduce electricity costs and maximize the business profit,at the same time the power enterprises can focus on their core business,enhance the competitiveness.But while it creates high-yield production,it is inevitably very risky,and the study of electric power enterprise operation outsourcing risk is still blank in China.Based on this situation,try to analysis and evaluation it by using the F-AHP evaluation method.Firstly,The concept and model characteristics of the electric power enterprises Operation Outsourcing were analyzed comprehensively,and a set of assessment indexes of electric power enterprises Operation Outsourcing risk was established,including 10 first level indicators and 37 second level indicators;according to the hierarchy and ambiguity of the electric power enterprises Operation Outsourcing Risk,the method combined with AHP and Fuzzy was proposed:the weight of each indicator to its upper factor was determined based on AHP,then evaluation model was built with the use of fuzzy mathematical theory.Finally,the final adoption of numerical example demonstrated the effectiveness and feasibility of the evaluation system.
What problem does this paper attempt to address?