Study on the Integrated Testing Platform for CTCS Level 3 Train Operation Control System

Xuesheng Ji,tao Tang
DOI: https://doi.org/10.3969/j.issn.1000-7458.2007.07.001
2007-01-01
Abstract:Based on analyzing the ETCS test and the interconnection and intercommunication test, the CTCS-3 level train operating control system's synthesis tests contents platform function demand, overall structure, equipment disposition and so on are introduced with emphasis. This platform establishment may provide the good assistance design,the integration debugs and the test environment confirmation for the key technologies research and the system equipment integration.
What problem does this paper attempt to address?