A Best Possible Deterministic On-Line Algorithm for Minimizing Makespan on Parallel Batch Machines.

Peihai Liu,Xiwen Lu,Yang Fang
DOI: https://doi.org/10.1007/s10951-009-0154-4
2009-01-01
Journal of Scheduling
Abstract:We study on-line scheduling on parallel batch machines. Jobs arrive over time. A batch processing machine can handle up to B jobs simultaneously. The jobs that are processed together form a batch and all jobs in a batch start and are completed at the same time. The processing time of a batch is given by the processing time of the longest job in the batch. The objective is to minimize the makespan. We deal with the unbounded model, where B is sufficiently large. We first show that no deterministic on-line algorithm can have a competitive ratio of less than \(1+(\sqrt{m^{2}+4}-m)/2\), where m is the number of parallel batch machines. We then present an on-line algorithm which is the one best possible for any specific values of m.
What problem does this paper attempt to address?