Influence of capital cost input on optimized round-trip efficiency of pumped thermal electricity storage under finite time thermoeconomic optimization

Yanchao Zhang
DOI: https://doi.org/10.1016/j.est.2024.114285
IF: 9.4
2024-10-26
Journal of Energy Storage
Abstract:Pumped thermal electricity storage (PTES) is a large-scale energy storage technology that stores electricity in the form of heat. The capital cost input is one of the crucial metrics for evaluating the economic benefits of this technology. In this paper, the thermodynamic performance of the PTES is theoretical predicted by finite time thermoeconomic optimization. The influence of capital cost input on the optimization performance of the PTES is comprehensively analyzed by phenomenological parameterization. The upper bounds of the capital cost input and the round-trip efficiency are first derived. Moreover, the optimal capital cost input is determined, which not only guarantees the maximum power output, but also can well trade-off the round-trip efficiency and power input, and the corresponding optimized round-trip efficiency at the maximum power output is also obtained. By analyzing the competitive relationship between capital cost input, power input, and round-trip efficiency, two optimal ranges of round-trip efficiency of the PTES with different performance advantages and corresponding capital cost input ranges are determined. The research in this paper provides a universal thermodynamic analysis, which provides a theoretical basis for the practical operation and economic decision-making of PTES.
energy & fuels
What problem does this paper attempt to address?