An adaptive peak load day for bidirectional soft-linking approach in generation expansion planning considering short-term problem

Thiago da Luz
DOI: https://doi.org/10.1016/j.ijepes.2024.109818
IF: 5.659
2024-01-28
International Journal of Electrical Power & Energy Systems
Abstract:Incorporating short-term assessment into long-term planning is critical to capturing the operational characteristics of generation and addressing flexibility issues. In this study, a novel bidirectional soft-linking technique is proposed to solve the generation expansion planning problem. Flexibility metrics (namely, residual load range and ramping capacity) are applied to assess the methodology performance. An adaptive day for peak reserve is proposed to couple the long- and short-term problems, applying the rolling horizon technique in the short-term problem. The proposed model is applied in the Brazilian power system, resulting in a scenario with 15.8 % solar, 9.3 % wind and 26 % hydropower, requiring only 2 % non-renewable energy in 2050. The results show that approaches based on peak reserve are inefficient and may lead to technically unfeasible results. The proposed technique converges close to the global optimal solution and reduces the convergence speed by 61 %. The rolling horizon reduced simulation time; however, in a system with storage hydropower plants, convergence may be affected, and the number of small horizons should be limited.
engineering, electrical & electronic
What problem does this paper attempt to address?