A Stochastic Rolling Horizon-Based Approach for Power Generation Expansion Planning

Hanyun Wang,Tao Wang,Xinyi Wang,Bing Li,Congmin Ye
DOI: https://doi.org/10.1155/2021/6635829
IF: 1.43
2021-06-29
Mathematical Problems in Engineering
Abstract:Variable renewable energy sources introduce significant amounts of short-term uncertainty that should be considered when making investment decisions. In this work, we present a method for representing stochastic power system operation in day-ahead and real-time electricity markets within a capacity expansion model. We use Benders’ cuts and a stochastic rolling-horizon dispatch to represent operational costs in the capacity expansion problem (CEP) and investigate different formulations for the cuts. We test the model on a two-bus case study with wind power, energy storage, and a constrained transmission line. The case study shows that cuts created from the day-ahead problem gives the lowest expected total cost for the stochastic CEP. The stochastic CEP results in 3% lower expected total cost compared to the deterministic CEP capacities evaluated under uncertain operation. The number of required stochastic iterations is efficiently reduced by introducing a deterministic lower bound, while extending the horizon of the operational problem by persistence forecasting leads to reduced operational costs.
engineering, multidisciplinary,mathematics, interdisciplinary applications
What problem does this paper attempt to address?