Optimal Sizing and Management of Hybrid Wind Turbine‐Diesel‐Battery System for Reverse Osmosis Seawater Desalination in NEOM City
Mohamed K. Hassan,Hegazy Rezk,Hamdy Youssef,Ahmed S. Shehata,Alaa A. El-Bary,Ayman Al-Quraan
DOI: https://doi.org/10.1155/2024/2941404
IF: 4.6
2024-05-29
International Journal of Energy Research
Abstract:Optimal sizing and management of hybrid wind turbine‐diesel‐battery system for reverse osmosis seawater desalination in NEOM city is the objective of the paper. Therefore, the paper explored the different factors to optimize and introduce a technoeconomic evaluation and energy management of a stand‐alone wind turbine (WT) system, diesel generator (DG), and battery storage (BS). The suggested WT/DG/BS system is implemented to feed seawater reverse osmosis (SWRO) unit in NEOM. The necessitated desalinated water per day is 100 m3. To determine the optimal size of WT/DG/BS corresponding to the minimum cost of energy (COE) and net present cost, two different ratings of the SWRO units (SWRO‐100 and SWRO‐150), three control dispatch strategies (load following, cycle charging, and combined dispatch), and five types of batteries are considered. HOMER software is performed to simulate and optimize the WT/DG/BS. The optimization results indicated that the best battery storage is the Trojan SAGM battery. In this case, the COE ranged between 0.564/kWh. The lowest COE of ‐ 0.564/kWh is obtained when using load following control strategy and SWRO‐150 unit. The best option of the WT/DG/BS system to supply the SWRO unit is option number 26. This system includes one wind turbine of 90 kW, DG of 25 kW, 47 Trojan SAGM batteries, a 23.8 kW converter, a SWRO‐100 unit, and a combined control strategy. The net present cost and the initial cost are 221,495, respectively. The annual operating cost and annual consumed fuel are 0.373/kWh (using only DG/BS) to $0.337/kWh (using the best option) by around 9.65%. Under this condition, the values for the internal rate of return, return on investment, and simple payback are 11%, 7.8%, and 8.3 years, respectively.
energy & fuels,nuclear science & technology