Blocking and isolating body design of No.1 branch construction tunnel of hydraulic power of some hydroelectric station

He La
Abstract:According to the basic conditions of No.1 branch construction tunnel of hydroelectric power of a hydroelectric station,it explores the closure body design and plug layout etc.Meanwhile,it elaborates the seepage control design,with a view to perfect the closer design of branch construction tunnel,and to ensure the project effectiveness.
Engineering,Environmental Science
What problem does this paper attempt to address?