Lining Reinforcement Calculation of Non-circular Pressure Tunnel in Small and Medium Hydropower Station

Yang Xiaojuan,Qi Wenbang,Zheng Jun,Li Peng
DOI: https://doi.org/10.3969/j.issn.0559-9342.2012.01.009
2012-01-01
Abstract:The pressure tunnel of small and medium hydropower stations are not suitable to select the circular cross-section as the limits of investment and construction technology,and current specifications do not explicitly give the calculation formula for non-circular pressure tunnel reinforced concrete lining reinforcement,so the choice of pressure tunnel cross-section is often a problem in the design of small and medium hydropower station.Taking the diversion tunnel of Zhimulin Hydropower Station as an example,the horseshoe-like cross-section is selected because of less construction difficulty,lower cost and greater applicability,and the lining reinforcement program is determined after simulating various operation conditions of tunnel based on geological data and ANSYS.The construction of tunnel is smoothly progressed at present.
What problem does this paper attempt to address?