Samuel, Bryan (2014) Modelling and comparing the seasonal and diurnal components of electricity demand, wind speed, wave height and wave period; for the Isles of Lewis and Harris. In: 2nd International Conference on Environmental Interactions of Marine Renewable Energy

Harris,B. Samuel
Abstract:The location of the Isles of Lewis and Harris, off the west coast of mainland Scotland (Figure 1), is favourable for the generation of renewable electricity from both the wind and ocean waves. However the islands’ position on the UK electrical grid’s periphery, with restricted local network capacity and only a limited connection to the mainland, makes it more challenging to capitalise on this advantage. This study sought to explore the relationship between the local wind and wave resources and consider how they track the islands’ indigenous demand for electricity. This was accomplished by using a mixture of Fourier analysis and auto-regressive techniques to model and de-trend local electricity demand data gathered over a 365 day period; and similarly process the wave and wind parameters associated with renewable generation, obtained from Hebridean metrological measurements recorded over the same interval. Results confirm that due to the partially complimentary relationship between wind and wave power, balancing generation across these sources is more likely to be efficient at matching customer demand, rather than a reliance on electricity from wind power alone. This would seem particularly significant for relatively isolated networks with only limited local network capacity and modest quantities of conventional generation available to balance any fluctuations in renewable supply. In conclusion, for the Isles of Lewis and Harris over the 365 day period studied, where grid capacity is restricted and such resources are available, it appears advantageous in terms of network efficiency to combine generation from wind and wave sources. INTRODUCTION As part of its efforts to encourage developments in the resource rich areas around Scotland, the Scottish Government has sought to incentivise the marine energy sector. This strategy has included funding the Saltire Prize, a £10m award to be presented to the first developer able to generate 100GWh of electricity from wave or tidal sources, over a two year interval [1]. In addition, agencies of the Scottish Government have initiated Hebridean Marine Energy Futures (HMEF), a programme that brings together commercial organisations from across the marine energy sector with academic institutions, in order to promote the skill and knowledge growth required to progress the Scottish marine energy sector towards full-scale industrialisation and future market expansion. Work on HMEF project has included site surveys and resource assessments; investigation of grid connection issues; planning consent strategies; and the development of a business case for encouraging future investments. This study was completed as part of HMEF Work Package 3, which sought to consider the effects of marine energy on power system operation; specifically endeavouring overall to quantify the amount of spare capacity on the Lewis/Harris grid that may be available to accommodate marine energy developments, both as it is currently configured and subsequent to a new HVDC interconnector that has been proposed for reinforcing the connection between the Isles of Lewis/Harris and the Scottish mainland [2]. Figure 1 : The Isles of Lewis and Harris
Engineering,Environmental Science
What problem does this paper attempt to address?