Issues in Accessing Enormous Renewable Resource in Ireland

Grattan Healy
DOI: https://doi.org/10.1007/978-3-319-45659-1_37
2017-01-01
Abstract:Ireland has a potential renewable resource that is many multiples of its own total energy demand, which is why the Irish Government is currently in the process of making an agreement with the UK for renewable electricity exports. The resource is primarily wind and wave energy located in the vast marine Exclusive Economic Zone, which is some 6 times the landmass area. And yet it is already proving very difficult to achieve the EU 2020 16 % primary energy target, which requires that 40 % of electricity should come from renewable sources, mostly wind energy. Failure to meet that target will prevent exports. The main obstacle is grid development, with connection delays that can reach 10–15 years for firm access, which then reverses the whole project development process, making it very complex, risky and costly. In addition, the ‘REFIT’ support price is modestly attractive to investors, when projects must pay huge connection and other administrative costs. Planning permission for projects and their connections is increasingly unpredictable, more difficult, with a reducing number of projects getting consent, and some projects having issues with retrospective changes to or withdrawal of permissions. Based on a presentation to IRENEC 2013, The paper sets out the issues, and analyses them in terms of timing, cost and risk. It proposes a solution based on the simpler German model of wind development.
What problem does this paper attempt to address?