Research of ice prevention role in Ningxia-Inner mongolia river reach of Daliushu hydro project

Y. Bin
Abstract:Through statistics method and analysis of Longyangxia and Liujiaxia Reservoir on the role of the Ningxia-Inner Mongolia River ice prevention,pointed out that the icicle prevention role of Long and Liu Reservoir is flow and temperature control in the ice flood season,the ice flood situation become milder,ice dam in river reach of Inner Mongolia is reduce in the river opening period;at the same time,the problem also exists and aggravates seriously when ice jam appears in river closing period and icicle appears in river closing and opening period.According to Daliushu Reservoir characteristics of capacity,temperature and discharge,changes of icicle situation is predicted in Ningxia-Inner Mongolia reach,and validity of manage method is analyzed when Daliushu hydro project uses for icicle prevention,and analysis with flow calculation shows the relationship of South-North Water Diversion to Daliushu hydro project in icicle prevention and flood discharge.The conclusion is inferred that icicle prevention role of Daliushu hydro project is irreplaceable status and advantages which is compared to Longyangxia and Liujiaxia Reservoir in Ningxia-Inner Mongolia reach of the icicle prevention.
Environmental Science,Engineering
What problem does this paper attempt to address?