A renewable power system for an off-grid sustainable telescope fueled by solar power, batteries and green hydrogen

Isabelle Viole,Guillermo Valenzuela-Venegas,Marianne Zeyringer,Sabrina Sartori
DOI: https://doi.org/10.1016/j.energy.2023.128570
2023-08-14
Abstract:A large portion of astronomy's carbon footprint stems from fossil fuels supplying the power demand of astronomical observatories. Here, we explore various isolated low-carbon power system setups for the newly planned Atacama Large Aperture Submillimeter Telescope, and compare them to a business-as-usual diesel power generated system. Technologies included in the designed systems are photovoltaics, concentrated solar power, diesel generators, batteries, and hydrogen storage. We adapt the electricity system optimization model highRES to this case study and feed it with the telescope's projected energy demand, cost assumptions for the year 2030 and site-specific capacity factors. Our results show that the lowest-cost system with LCOEs of $116/MWh majorly uses photovoltaics paired with batteries and fuel cells running on imported and on-site produced green hydrogen. Some diesel generators run for backup. This solution would reduce the telescope's power-side carbon footprint by 95% compared to the business-as-usual case.
Physics and Society,Instrumentation and Methods for Astrophysics
What problem does this paper attempt to address?
### Problems the paper attempts to solve The paper aims to solve the problem of the dependence on fossil fuels in the energy supply of astronomical research facilities, especially astronomical telescopes. Specifically, the paper explores the methods of designing a low - carbon and sustainable off - grid power system for the newly planned Atacama Large Aperture Submillimeter Telescope (AtLAST). The paper compares multiple power system schemes based on renewable energy and contrasts them with the traditional diesel - powered generation system to evaluate their economic and environmental benefits. ### Main research objectives 1. **Levelized Cost of Electricity (LCOE)**: - Which power system can supply power to the planned telescope at the lowest cost? 2. **Cost without direct CO₂ emissions**: - How much more does it cost to use a power system without direct CO₂ emissions than the traditional system? 3. **Robustness under future cost uncertainty**: - Which system settings have high robustness under future cost uncertainty? ### Research background Currently, the carbon footprint of astronomy mainly comes from the need for fossil fuels to power observatories. The carbon footprint per astronomer per year is estimated to be about 37 tons of carbon dioxide equivalent (CO₂e), and the entire industry emits about 1,200 kilotons of CO₂e annually, accounting for 0.0024% of global greenhouse gas emissions. To reduce the carbon footprint, many observatories have begun to adopt renewable energy technologies. For example, the Gemini Observatory in Hawaii has been powered by 10% solar photovoltaic (PV) arrays since 2015, the La Silla Observatory in the Atacama Desert in Chile has been powered by more than 50% solar energy since 2016, and the Paranal Observatory also installed PV arrays in 2022. ### Research methods The paper uses a high - resolution power system optimization model (highRES) to design and optimize the power system of AtLAST. The model takes into account the expected power demand of the telescope, cost assumptions in 2030, and the capacity factor of specific locations. The research is divided into eight scenarios: 1. **Using diesel generators at an altitude of 5,000 meters (Business - As - Usual, BAU)**. 2. **Combining PV and diesel - powered generation**: - At an altitude of 5,000 meters (PVD ↑). - At an altitude of 2,500 meters (PVD ↓). 3. **Combining PV generation and hybrid energy storage systems**: - At an altitude of 5,000 meters, with diesel backup (PVDES ↑). - At an altitude of 2,500 meters, with diesel backup (PVDES ↓). - At an altitude of 5,000 meters, a pure renewable energy system (RES ↑). - At an altitude of 2,500 meters, a pure renewable energy system (RES ↓). 4. **Concentrating solar power (CSP) at an altitude of 2,500 meters**. ### Main results 1. **Lowest - cost system**: - The results show that the lowest - cost system is the one with an LCOE of 116 US dollars per megawatt - hour, mainly using photovoltaics paired with batteries and fuel cells operating on imported and on - site - produced green hydrogen. A small number of diesel generators are used for backup. This solution can reduce the carbon footprint by 95% compared to the baseline case. 2. **Cost without direct CO₂ emissions**: - Using a power system without direct CO₂ emissions costs 6 - 9 percentage points (pp.) more than the traditional system. 3. **Robustness under future cost uncertainty**: - In the absence of battery parks or green hydrogen, the LCOE of the system increases by 6 - 10 percentage points respectively. This indicates that even under future cost uncertainty, the system combining photovoltaics, batteries, and green hydrogen is still the most economical and sustainable choice. ### Conclusions The paper shows through an optimization model how to design an economical and environmentally - friendly off - grid power system for AtLAST. The research results show that the system combining photovoltaics, batteries, and green hydrogen not only has a lower cost but also can significantly reduce the carbon footprint, providing a feasible low - carbon solution for similar research facilities.