A preliminary study for numerical and analytical evaluation of surface settlement due to EPB shield TBM excavation

Kyoung-Yul Kim,Jun-beom An,G. Cho,Seok-Jun Kang,J. J. Kim
DOI: https://doi.org/10.9711/KTAJ.2021.23.3.183
2021-05-01
Abstract:The EPB (Earth Pressure Balanced) shield TBM method restrains the ground deformation through continuous excavation and support. Still, the significant surface settlement occurs due to the ground conditions, tunnel dimensions, and construction conditions. Therefore, it is necessary to clarify the settlement behavior with its influence factors and evaluate the possible settlement during construction. In this study, the analytical model of surface settlement based on the influence factors and their mechanisms were proposed. Then, the parametric study for controllable factors during excavation was conducted by numerical method. Through the numerical analysis, the settlement behavior according to the construction conditions was quantitatively derived. Then, the qualitative trend according to the ground conditions was visualized by coupling the numerical results with the analytical model of settlement. Based on the results of this study, it is expected to contribute to the derivation of the settlement prediction algorithm for EPB shield TBM excavation.
Geology,Environmental Science,Engineering
What problem does this paper attempt to address?