Solving the multi-objective job shop scheduling problems with overtime consideration by an enhanced NSGA-II

Shuangyuan Shi,Hegen Xiong
DOI: https://doi.org/10.1016/j.cie.2024.110001
IF: 7.18
2024-02-01
Computers & Industrial Engineering
Abstract:In make-to-order (MTO) manufacturing enterprises, when the workload of the manufacturing system is heavy, it may lead to the delay of orders. In order to reduce the delay and the resulting negative impact, the appropriate and reasonable overtime work is an effective and commonly used approach. However, if the overtime work is used unreasonably, not only cannot it increase the production speed but also may lead to higher manufacturing costs. In order to use overtime work optimally, a multi-objective job shop scheduling problem with overtime work consideration (MOJSSP/O) is proposed to minimize total tardiness and overtime costs. An enhanced non-dominated sorting genetic algorithm II (ENSGA-Ⅱ) is developed to address the problem. To accelerate the convergence, a problem-specific two-stage decoding scheme is designed. An adaptive mechanism is applied to keep the stability of global convergence and a local search procedure is adopted to enhance the exploitation ability. Experiments on 38 modified JSSP benchmarks are provided to evaluate the proposed algorithm. Computational results validate the effectiveness of the presented improvements, and show that the proposed ENSGA-Ⅱ outperforms the other well-known multi-objective evolutionary algorithms on all test instances.
computer science, interdisciplinary applications,engineering, industrial
What problem does this paper attempt to address?