An Overview of Extremely Large Telescopes Projects

R. G. Carlberg
DOI: https://doi.org/10.1017/S1743921306000238
2005-12-21
Abstract:IAU Symposium 232 allows a snapshot of ELTs at a stage when design work in several critical mass projects has been seriously underway for two to three years. The status and som eof the main initial design choices are reviewed for the North American Giant Magellan Telescope (GMT) and the Thirty Meter Telescope (TMT) projects and the European Euro50 and the Overwhelmingly Large (OWL) projects. All the projects are drawing from the same "basket" of science requirements, although each project has somewhat different ambitions. The role of the project offices in creating the balance between project scope, timeline and cost, the "iron triangle" of project management, is emphasized with the OWL project providing a striking demonstration at this meeting. There is a reasonable case that the very broad range of science would be most effectively undertaken on several complementary telescopes.
Astrophysics
What problem does this paper attempt to address?
The problems that this paper attempts to solve are to explore and summarize the design progress, technical challenges and scientific goals of several Extremely Large Telescopes (ELTs) projects in the world currently. Specifically, the paper mainly focuses on the following aspects: 1. **Background and Motivation**: - Firstly, the paper reviews the reasons why the ELT projects were launched since 2000 with the emergence of new scientific questions and the progress of technology (such as adaptive optics and mirror segmentation technology). These factors include the requirements for new scientific discoveries, the application of new technologies and more economical construction methods. 2. **Scientific Goals**: - The scientific goals of the ELT projects focus on the following key areas: - The physical characteristics and formation mechanisms of exoplanets. - The internal mechanisms of star and galaxy formation. - The nature of dark matter and dark energy. - The complementarity with other frontier astronomical facilities (such as JWST and ALMA), and the research of multi - band astronomy. 3. **Technical and Financial Feasibility**: - The paper discusses the technical and financial feasibility of the ELT projects, especially how to achieve higher performance and lower cost through the Adaptive Optics system (AO) and mirror segmentation technology. It is expressed by the formula: \[ f_D D^4 S^2 + f_{AO} D^2 \] where \(D\) is the telescope aperture, \(S\) is the Strehl ratio of the adaptive optics system, and \(f_D\) and \(f_{AO}\) are the proportions of diffraction - limited observation time and seeing - limited observation time respectively. 4. **Project Management**: - It emphasizes the role of the project office in balancing the project scope, cost and time (i.e., the "iron triangle"). The project office needs to coordinate the requirements of scientists and the practical capabilities of engineers to ensure that the telescope can be completed on time and within budget. 5. **Introduction of Specific Projects**: - The paper details several major ELT projects, including the Giant Magellan Telescope (GMT) and the Thirty Meter Telescope (TMT) in North America, and the Euro50 and the Overwhelmingly Large Telescope (OWL) projects in Europe. Each project has its unique design features and scientific instrument configurations. 6. **Conclusion**: - Finally, the paper summarizes the scientific importance and future development directions of the ELT projects, pointing out that multiple complementary ELT projects will maximize the observation opportunities and reduce the idle time of large instruments. In conclusion, this paper aims to comprehensively overview the current situation and development trends of the ELT projects, emphasizing their crucial roles in solving the major current astronomical problems.