A Study on the Development of Automated Gangform Climbing System for Apartment Housing Construction

Ji-Won Cho,Sang-Hoon Yang,Jeong-ho Lee,Young-Suk Kim,Jae-yong Cho
DOI: https://doi.org/10.6106/KJCEM.2012.13.1.053
2012-01-31
Abstract:Gangform compared with conventional wood and steel form is systemized form which has a capability to install and dismantle form at a time without repeating to assembly and disassembly small members. Gangform compared with ACS has some problems such as 1) Tower Crane load increase, 2) increase in safety incidence during climbing Gangform, 3) decrease in detachment operation productivity, 4) stop work due to climate impacts, and 5) decrease in labor cost, productivity, quality. A conceptual design model of automated Gangform climbing system is suggested for apartment housing construction to show its technical/economic feasibility and workers` safety while increasing operation productivity and concrete quality.
Environmental Science,Engineering
What problem does this paper attempt to address?