Study on operation and capacity optimization of distributed PV system with battery in steel plant

Zeyu Ding,Fan Zhang,Shijun Tian
DOI: https://doi.org/10.1109/ACFPE56003.2022.9952301
2022-10-01
Abstract:Under the overall situation of the total coal consumption limitation and low-carbon development, the development of distributed renewable energy in iron and steel enterprises is particularly important. In this paper, a distributed photovoltaic (PV) system with battery for the steel plant is designed, which can effectively reduce the purchased electricity, improve the utilization rate of green electricity, and further improve the overall economic and environmental benefits. This paper comprehensively considers the economic and environmental benefits of the system, and adopts the linear programming method to optimize the scheduling and operation of each power supply equipment. After optimization, the all-day electricity cost is 3633800 RMB, and the carbon dioxide emission is 3825.53 t. In addition, the battery capacity in the system has been optimized. The optimal battery capacity is 320 MWh, and the annual net income is 374.71 million RMB.
Engineering,Environmental Science
What problem does this paper attempt to address?