Optimising the placement of additional drill holes to enhanced mineral resource classification: a case study on a porphyry copper deposit

Mohammad Maleki,Daniel Baeza,Saeed Soltani-Mohammadi,Nasser Madani,Eduardo Díaz,Francisco Anguita
DOI: https://doi.org/10.1080/17480930.2024.2364131
IF: 3.022
2024-06-22
International Journal of Mining Reclamation and Environment
Abstract:In this study, we compared outcomes of optimising the placement of five additional drill holes using three geostatistical cost functions (AKV, WAKV, and CV) and the Particle Swarm Optimisation algorithm (PSO). WAKV identified locations with higher average copper grades compared to AKV. Conversely, CV suggested sites with high kriging variance and copper grade variation. Initial holes, alongside those determined by each cost function, were used to classify mineral resources. Findings underscored the effectiveness of optimising drill hole placement based on cost functions in reducing uncertainty and improving mineral resource classification.
environmental sciences,mining & mineral processing
What problem does this paper attempt to address?