Hydroxylamine addition and real-time aeration control in sewage nitritation system for reduced start-up period and improved process stability

Jia Li,Liang Zhang,Jie Liu,Jia Lin,Yongzhen Peng
DOI: https://doi.org/10.1016/j.biortech.2019.122183
IF: 11.4
2019-12-01
Bioresource Technology
Abstract:<p>Sewage nitritation is a promising process for nitrogen removal, but its practical application is limited by long start-up period and unstable operation. In this study, hydroxylamine (NH<sub>2</sub>OH) addition and real-time aeration control strategies were adopted for the promotion of sewage nitritation in a sequencing batch reactor. Initially, 4.5 mg/L NH<sub>2</sub>OH was added into reactor every 24 h to establish nitritation, increasing the nitrite accumulation ratio (NAR) from 1.7% to 93% in 19 d. In the following period, NH<sub>2</sub>OH addition was stopped and nitritation remained stable over 55 d, with NAR of 97% by real-time aeration control. The aeration duration was determined by characteristic points on pH curve. The main genera of nitrite oxidizing bacteria, <em>Nitrobacter</em> and <em>Nitrospira</em>, were both eliminated from the system, supporting the long-term stability of nitritation. Overall, NH<sub>2</sub>OH addition and real-time aeration control is an excellent strategy for establishing and maintaining effective sewage nitritation.</p>
energy & fuels,biotechnology & applied microbiology,agricultural engineering
What problem does this paper attempt to address?