Thoughts on the transformation and development of mechanized and intelligent construction of pumped storage power stations under the dual carbon goal

Xueshan Liu,Yufei Huang,Yunli Shi,Yueyang Zheng
DOI: https://doi.org/10.1088/1742-6596/2752/1/012145
2024-06-25
Journal of Physics Conference Series
Abstract:How to shorten the construction cycle of pumped storage power plants under the dual carbon target is an urgent core problem that needs to be studied and solved under the current situation of large-scale and high proportion development of pumped storage power plants. At the same time, based on the fact that the traditional construction methods and processes in the pumped storage industry are still in the primary stage at present, China Southern power grid peak shaving and frequency modulation power generation Co., Ltd. proposed and carried out the research on the transformation of the mechanized and intelligent construction of pumped storage power stations. It plans to rely on the pumped storage power stations under construction and to be built, combined with their respective engineering characteristics, to study the complete set of construction equipment for the construction of pumped storage power stations and the matching intelligent application platform, Gradually achieve the long-term goals of mechanized replacement, automatic personnel reduction and intelligent unmanned construction of pumped storage power stations.
What problem does this paper attempt to address?