Economic value of long-lead streamflow forecasts for Columbia River hydropower

Alan F Hamlet, Daniel Huppert, Dennis P Lettenmaier
2002-03-01
Abstract:Recent advances in long-lead climate forecasting have made it possible to produce useful streamflow forecasts for the Columbia River basin roughly six months earlier than current forecasts that rely on snowpack measurements. The resulting increase in forecast lead time facilitates considerable improvements in system operating performance, especially in years of expected above average flows. In the current reservoir operating system, the so called “critical” and “assured refill” rule curves that restrict releases for hydropower generation in the period from August to December are based on the critical (most severe low flow) and third lowest flow sequences of record, respectively. These rule curves provide appropriate protection of energy capacity and reservoir refill in extreme low flow conditions, but are restrictive in normal and high flow years until midwinter when operational streamflow forecasts based on …
What problem does this paper attempt to address?