A PSA-based approach for the evaluation of plant level testing strategies

Douglas Barreto de Oliveira Fonseca,José de Jesús Rivero Oliva
DOI: https://doi.org/10.1016/j.nucengdes.2024.113191
IF: 1.7
2024-04-10
Nuclear Engineering and Design
Abstract:While existing literature comprehensively outlines the pros and cons of simultaneous, sequential, or staggered testing of redundant trains, the combined effect of these strategies on plant level risk has been underexplored. In order to investigate plant level testing strategies, this paper proposes an approach based on Probabilistic Safety Assessment (PSA) methods that utilizes time-dependent reevaluation only on selected most important plant Minimal Cut Sets (MCSs). The proposed approach is applied to a generic Pressurized Water Reactor (PWR) PSA model and a sensitivity analysis reveals that different testing strategies can result in up to a 9% variation in risk levels. The results show that basic events of little importance in the original PSA model may become more important (or vice versa) when evaluated by the proposed approach depending on the testing strategy adopted. Furthermore, an investigation of the factors that define which strategies are better or worse for risk concludes that beyond avoiding testing overlaps in different systems, correctly staggering the unavailability of components is also necessary to reduce risk.
nuclear science & technology
What problem does this paper attempt to address?