Suspended sediment transport in small and medium estuaries with the sluice gate:a case study of the Xinyanggang Estuary, China

Gao Jianhua,W. Yaping,Cheng Jian,Xiang Ming,Zhu Guo-xian,Liang Mingliang,Z. Jianhua,Lu Ticheng,Yang Yang,Zhang Jicai
Abstract:Construction of sluice gate in tidal estuaries could severely change local sediment dynamic conditions, as well as the topography, which often leads to the high deposition of fine sediments in channels. Based on the survey at 3 anchor stations located at sluice gate downstream in both spring and neap tidal cycles during 18-24 August 2012, we studied the characteristics of suspended sediment concentration change in Xinyanggang estuary. The results showed that this estuary belonged to the semi-diurnal tide. The flood duration was shorter with stronger current velocity than the ebb duration during the spring tide. There are strong sediment resuspension and siltation during a tidal cycle. The magnitude of the resuspension flux could be as large as 10-3kg m-2s-1. This could not only lead to strong resuspension, but also transport water with high sediment concentration upstream at sluice gate, which might be the main reason for the channel siltation. When the sluice gate was open, the fresh water resulted in a relatively strong vertical salinity gradient in the early and later stage, which leaded to the damping of sediment resuspension. However, when the amount of fresh water increased enough, the water velocity increased rapidly and resulted in a strong resuspension and sediment transport towards the river mouth. It had the advantage of keeping the channel depth.
Environmental Science
What problem does this paper attempt to address?