BIM-based schedule generation and optimization using genetic algorithms

Hossam Wefki,Mohamed Elnahla,Emad Elbeltagi
DOI: https://doi.org/10.1016/j.autcon.2024.105476
IF: 10.3
2024-05-20
Automation in Construction
Abstract:This research presents a transformative framework to tackle challenges within the construction industry, where efficiency is hindered by limited digitalization and disjointed project phases. The framework seamlessly integrates state-of-the-art technologies, such as Building Information Modeling (BIM), Genetic Algorithms (GAs) for schedule optimization, 5D simulation, and a Business Intelligence (BI) Dashboard. By doing so, it effectively enhances productivity while bridging the gap between the realms of management and engineering. A comprehensive literature review underpins the framework's design, focusing mainly on BIM-based schedule generation and optimization. The approach's validity is demonstrated through a compelling case study, showcasing automated BIM model creation, BIM-Based schedule generation limited to structural elements of bottom-up Cast-in-situ construction method, GAs-driven schedule optimization, 5D project simulation, and the integration of the BI dashboard. This research propels operational efficiency and promotes harmonious integration with pre-existing software systems, thus facilitating smoother adoption and adaptation.
construction & building technology,engineering, civil
What problem does this paper attempt to address?