Aggressive pre-cooling of an office building to reduce peak power during extreme heat days through passive thermal storage

Jason Jarvinen,Mark Goldsworthy,Peter Pudney,Stephen White,Lui Cirocco,Frank Bruno
DOI: https://doi.org/10.2139/ssrn.4333442
2024-02-18
Sustainable Energy, Grids and Networks
Abstract:Extreme temperatures can cause strain on electrical energy infrastructure. Additionally, network infrastructure and generators are sized for peak consumption. Hence, higher peak usage leads to higher electricity costs to build and maintain this capacity. Emergency energy reserve supply or demand response during energy shortages can come at a cost orders of magnitude higher than normal. Commercial buildings have high thermal inertia that can be charged to store energy passively through pre-cooling and so reduce HVAC peak power. To date, work on pre-cooling to reduce peak-power has focused on pre-cools immediately before the event and includes raising the setpoint during the event, possibly impact occupant comfort. This paper uses a different approach to reduce peak demand without changing occupied zone setpoints during occupied hours. Instead, the pre-cooling is outside of occupied hours long before the peak demand event. This paper examines if such an approach is feasible or will all stored thermal energy dissipate prior to the peak demand event. Parametric simulations of a commercial office building show that maximum capacity pre-cooling for 2 to 12 hours lead to a reduction in peak power demand of 3.4% and as much as 6.6% for an oversized cooling plant. Despite higher overall energy use, a small cost saving under existing tariffs was achieved. For bulk energy supply the cost was an order of magnitude less than historical purchases in Australia. This study demonstrates the financial viability for deeper building pre-cooling for wholesale demand response and as cheap form of emergency bulk energy supply.
energy & fuels,engineering, electrical & electronic
What problem does this paper attempt to address?