Integrating Inland Ports into the Intermodal Goods Movement System for Ports of Los Angeles and Long Beach

D. Epstein
Abstract:In the Los Angeles/Long Beach (LA/LB) port complex, the empty containers are handled twice: once they are recycled from importers and the second time they are trucked to exporters. Clearly a system is needed to facilitate the interchange of empties outside the ports, to reduce the traffic congestion and emissions around the ports. In this paper, the deterministic and stochastic empty container reuse problems are considered. The problems are modeled analytically, and approximation solution methods are developed. The developed optimization methods are evaluated using realistic simulation scenarios generated using past, current, and projected data from the LA/LB port area. Simulation results show the efficiency of the developed algorithms in terms of computational time and solution quality. Inland Empire Railroad Main Line Study Final Report, prepared for the Southern California Association of Governments by Leachman and Associates LLC, Gill V. Hicks and Associates, Inc., George R. Fetty and Associates, Inc., and Weston Solutions, Inc. Contract number 04-010, June 30, 2005. This study examines railroad infrastructure needs and operations for both freight and passenger trains in Southern California. Executive Summary: This document serves as the Final Report for this study. The existing railroad main line infrastructure from downtown Los Angeles east and north to Barstow and Indio is described. Passenger and freight traffic patterns are documented, and future train volumes are forecasted. Alternatives for routing future main-line train movements are formulated and analyzed. Results are presented from simulating Year 2010 and Year 2025 train operations in scenarios of increasing track capacity. These results identify track capacity improvements for each alternative required to maintain Year 2000 transit times while accommodating forecasted 2010 and 2025 traffic levels. Capital costs for these infrastructure improvements are estimated. Emissions from locomotives powering through train movements and from vehicular delays at grade crossings are estimated. Finally, the alternatives are ranked along the dimensions of capital costs, total
Environmental Science,Engineering,Business
What problem does this paper attempt to address?