Cost Control Model and Simulation Based on Principal-Agent Theory

Zhu Lian-jun
Abstract:The asymmetry information for cost control was analyzed and the principal-agent relationship of the equipment procurement was formed.In the view of incentive mechanism,utility functions for the contractors and military were constituted separately.Consequently,the cost control model between the military and contractors was built.The issue of how the military encourages the contractors to reduce the cost of equipment procurement initiatively was discussed under the moral hazard situation.Two determinative variables making military's expected utility greatest are decided by the optimization of the model.At last,the example was given by means of simulation.