Case Study: Turbine Load-Sharing and Load-Shedding System Foran Australian LNG Facility

Abdel Rahman Khatib,Anshuman Mallya,Bowen Dai,Roberto Costa
DOI: https://doi.org/10.1109/pcic30934.2019.9074511
2019-09-01
Abstract:This paper presents a turbine load-sharing and load-shedding system for an islanded liquefied natural gas facility in Australia. The system includes three independent and redundant load-shedding schemes: process-based contingency load shedding with predefined load group and load pairs, high-speed underfrequency-based load shedding, and progressive overload shedding with system frequency supervision. In addition to the load-shedding schemes, the site includes a generation control system with frequency control, voltage control, automatic synchronization, and turbine load-sharing schemes. A breaker-and-a-half configuration complicates the fast load-shedding scheme. Results from hardware-in-the-loop testing are shared.
What problem does this paper attempt to address?