PIP2-BD: GeV Proton Beam Dump at Fermilab's PIP-II Linac
M. Toups,R. G. Van de Water,Brian Batell,S. J. Brice,Patrick deNiverville,Bhaskar Dutta,Jeff Eldred,Timothy Hapitas,Roni Harnik,Aparajitha Karthikeyan,Kevin J. Kelly,Doojin Kim,Tom Kobilarcik,Gordan Krnjaic,B. R. Littlejohn,Bill Louis,Pedro A. N. Machado,Nityasa Mishra,V. Pandey,Z. Pavlovic,William Pellico,Michael Shaevitz,P. Snopok,Rex Tayloe,Adrian Thompson,R. T. Thornton,Douglas Tucker,Jaehoon Yu,Jacob Zettlemoyer,Bob Zwaska,R.G. Van de Water,S.J. Brice
DOI: https://doi.org/10.48550/arXiv.2203.08079
2022-03-15
High Energy Physics - Experiment
Abstract:The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-wave mode and can concurrently supply 800 MeV protons to a mega-watt, GeV-scale beam dump facility and to LBNF/DUNE. Designs for proton accumulator rings are being studied to bunch the PIP-II protons into the short pulses needed for neutrino and low-mass dark matter experiments. PIP2-BD is a proposed 100-ton LAr scintillation-only experiment, whose detector design is inspired by CENNS-10 and CCM, that would have world-leading sensitivities to BSM physics, including low-mass dark matter produced in the PIP-II proton beam dump.