Flexible Integrated Scheduling Considering Periodic Maintenance

Xueying Ding,Zhiqiang Xie,Wei Zhou,Zhenjiang Tan,Ming Sun
DOI: https://doi.org/10.3390/electronics13183730
IF: 2.9
2024-09-21
Electronics
Abstract:Aiming at the problem of current flexible integrated scheduling, most of the current research shortens the total processing time of products and ignores the loss of the equipment in the processing, which affects the scheduling ability of the equipment; in this context, a flexible integrated scheduling algorithm considering periodic maintenance (FIS-PM) is proposed. The algorithm flexibly mobilizes the processing sequence of the selected processing equipment, and uniformly maintains all equipment at a certain time. First, the ISA-PM algorithm adopts the strategy combination of the layer priority, the short-time, and the equipment priority strategy to schedule the operations. Then, based on the forest firefighting model, the maintenance start point and duration of the equipment are determined by the relationship between the number of the processed operations and the number of the unprocessed operations and the loss of equipment during the maintenance. Finally, the dynamic adjustment strategy is adopted, which not only realizes the maintenance of the equipment, but also reduces the makespan of the products. The experimental results show that the proposed ISA-PM algorithm realizes the optimization effect of reducing the makespan of complex products, completing the maintenance, and improving the overall utilization rate of equipment systems.
engineering, electrical & electronic,computer science, information systems,physics, applied
What problem does this paper attempt to address?