Canceling Onboard Braking Resistance and Optimal Design of Energy Feedback Systems in Urban Rail

Jian Zhang,Wei Liu,Zhongbei Tian,Qian Xu,Qingan Ma,Ziqiang Pan
DOI: https://doi.org/10.1109/tte.2023.3348524
IF: 6.519
2024-01-01
IEEE Transactions on Transportation Electrification
Abstract:The onboard braking resistance (OBR) is widely installed on urban rail trains. The general trend is to cancel OBR in urban rail, due to the low efficiency of using regenerative braking energy. The design of Energy feedback systems (EFSs) after canceling OBR is important because EFSs need to balance energy-saving effects and network voltage safety. Besides, the pneumatic braking may increase, so the brake shoe life needs to be further studied. In this paper, the electro-pneumatic braking and braking shoe wear models are first built. Then the power supply calculation algorithm considering OBR is proposed, including the train dynamic model, train brake power distribution rule, and power supply calculation algorithm. Next, the EFS optimal design after canceling OBR is discussed. The comprehensive cost includes the cost of changing braking shoes. A case study denotes that up to 20.5 MWh or 18.5% of the traction energy can be saved per day after canceling OBR and setting EFSs at each traction substation. The brake shoe life will be 92~159 days. In CLC/TR 50646, after canceling OBR, EFS should be installed at each TS. The optimal result does not follow the rule but can save at least 7.6% of the total cost compared with the actual project.
engineering, electrical & electronic,transportation science & technology
What problem does this paper attempt to address?