Strip Layering Diagram-Based Optimum Continuously Varying Pulse Interval Sequence Design for Extremely High-Resolution Spaceborne Sliding Spotlight SAR

Yan Wang,Zegang Ding,Pei Xu,Ke Chen,Tao Zeng,Teng Long
DOI: https://doi.org/10.1109/tgrs.2020.3028973
IF: 8.2
2021-08-01
IEEE Transactions on Geoscience and Remote Sensing
Abstract:Applying a continuous varying pulse interval (CVPI) sequence is of significance for an extremely high-resolution (EHR) spaceborne sliding spotlight synthetic aperture radar (SAR) for complete data acquisition. An optimum CVPI sequence should be the one leading to the minimum movement of the echoes of interest in a pulse train. However, such an optimization can be hardly conducted using the traditional timing diagram. Aiming at solving this problem, this article introduces a new graphic tool, referred to as the strip layering diagram, to achieve an optimum CVPI sequence for an EHR spaceborne sliding spotlight SAR. The basic rationale is to explicitly employ a new parameter <span class="mjpage"><svg xmlns:xlink="http://www.w3.org/1999/xlink" width="3.153ex" height="2.009ex" style="vertical-align: -0.338ex;" viewBox="0 -719.6 1357.5 865.1" role="img" focusable="false" xmlns="http://www.w3.org/2000/svg"><g stroke="currentColor" fill="currentColor" stroke-width="0" transform="matrix(1 0 0 -1 0 0)"> <use xlink:href="#MJMATHI-65" x="0" y="0"></use> <use xlink:href="#MJMATHI-74" x="466" y="0"></use> <use xlink:href="#MJMATHI-61" x="828" y="0"></use></g></svg></span> to directly control the movement of the echoes of interest in a pulse train. The new strip layering diagram consists of two layered subdiagrams: one is the candidate subdiagram, consisting of the candidate strips presenting all the CVPI sequence candidates restricted by the data acquisition geometry; the other is the feasibility subdiagram, consisting of the feasibility strips marking all the feasible regions where the echoes of interest are not submerged by the transmitted pulses or contaminated by the nadir echoes. An optimum CVPI sequence can be accurately and efficiently achieved by sketching a line segment satisfying four conditions inside the strip layering diagram. The detailed comparisons between the new diagram and the traditional timing diagram are also provided, followed by computer simulations to validate the presented approaches.<svg xmlns="http://www.w3.org/2000/svg" style="display: none;"><defs id="MathJax_SVG_glyphs"><path stroke-width="1" id="MJMATHI-65" d="M39 168Q39 225 58 272T107 350T174 402T244 433T307 442H310Q355 442 388 420T421 355Q421 265 310 237Q261 224 176 223Q139 223 138 221Q138 219 132 186T125 128Q125 81 146 54T209 26T302 45T394 111Q403 121 406 121Q410 121 419 112T429 98T420 82T390 55T344 24T281 -1T205 -11Q126 -11 83 42T39 168ZM373 353Q367 405 305 405Q272 405 244 391T199 357T170 316T154 280T149 261Q149 260 169 260Q282 260 327 284T373 353Z"></path><path stroke-width="1" id="MJMATHI-74" d="M26 385Q19 392 19 395Q19 399 22 411T27 425Q29 430 36 430T87 431H140L159 511Q162 522 166 540T173 566T179 586T187 603T197 615T211 624T229 626Q247 625 254 615T261 596Q261 589 252 549T232 470L222 433Q222 431 272 431H323Q330 424 330 420Q330 398 317 385H210L174 240Q135 80 135 68Q135 26 162 26Q197 26 230 60T283 144Q285 150 288 151T303 153H307Q322 153 322 145Q322 142 319 133Q314 117 301 95T267 48T216 6T155 -11Q125 -11 98 4T59 56Q57 64 57 83V101L92 241Q127 382 128 383Q128 385 77 385H26Z"></path><path stroke-width="1" id="MJMATHI-61" d="M33 157Q33 258 109 349T280 441Q331 441 370 392Q386 422 416 422Q429 422 439 414T449 394Q449 381 412 234T374 68Q374 43 381 35T402 26Q411 27 422 35Q443 55 463 131Q469 151 473 152Q475 153 483 153H487Q506 153 506 144Q506 138 501 117T481 63T449 13Q436 0 417 -8Q409 -10 393 -10Q359 -10 336 5T306 36L300 51Q299 52 296 50Q294 48 292 46Q233 -10 172 -10Q117 -10 75 30T33 157ZM351 328Q351 334 346 350T323 385T277 405Q242 405 210 374T160 293Q131 214 119 129Q119 126 119 118T118 106Q118 61 136 44T179 26Q217 26 254 59T298 110Q300 114 325 217T351 328Z"></path></defs></svg>
imaging science & photographic technology,remote sensing,engineering, electrical & electronic,geochemistry & geophysics
What problem does this paper attempt to address?