Estimation of river discharge using Monte Carlo simulations and a 1D hydraulic model based on artificial multi-segmented rating curves at the confluence of two rivers

Hansol Kang,Yeonsu Kim,Hyunuk An,Jisun Byun,Joonwo Noh
DOI: https://doi.org/10.1088/2515-7620/ad277c
2024-02-09
Environmental Research Communications
Abstract:To mitigate flood damages led by recent climate changes, reliable flow discharge data are essential for successful open-channel management during the extreme floods. Generally, flow discharge is computed using the rating curve (RC) established from the relation of flowrate and water level stage. Determination of the parameters of the rating curves are subject to the uncertainties related with difficulties and limitation of the flow monitoring to cover the wide ranges of flow variation. Especially at the river confluences, the uncertainties pronounces when flood occurs due to several factors such as roughness change, backwaters, and levee overflow. The Seomjin River basin in Korea suffered from flood inundation occurred at the tributary confluence during the extreme flood in 2020. In identifying the reliable flow rate of the main stream and tributary, this study proposed an indirect flow assessment scheme using a 1D hydrodynamic simulation model to find the best-simulated water level in an iterative manner based on the Monte Carlo (MC) simulation. With a large number of discharge data generated from the random number combination, it is possible to find the best results automatically by specifying the reliability limitation considering the uncertainty of the pre-determined RC parameters associated with the roughness coefficient. Nash Sutcliff-efficiency (NSE) was incorporated to evaluate the reproduced water level to meet the threshold specified for NSE ≥ 0.75. The simulated flowrates computed from the revised RC and roughness coefficients revealed error ranges of 8% ~ 36.6% compared with the design flood. The approach proposed in this study is applicable to determine the valid parameters necessary to create a revised RC at the existing water level gauge station where the uncertainties of the RC are pronounced especially in the vicinity of the channel confluence
environmental sciences
What problem does this paper attempt to address?