Scheduling Multi-Crane with Non-interference Constraint in Steel Production

Xie Xie,Li Zhou,Yongyue Zheng,Fucai Wan
DOI: https://doi.org/10.1109/icinfa.2018.8812433
2018-08-01
Abstract:This paper studied multi-crane scheduling problem with non-interference constraint arising in a finery shop of an iron and steel making enterprise. The problem exists in every large iron and steel company. We aim to minimize the makespan among cranes, i.e., the latest finery completion time among all ladles of the melted steel, is minimised. By exploring the problem structure, two effective heuristics are designed to solve the problem with two-crane and three-crane cases, respectively. We prove that the worst case performances are 4/3 for two-crane and 5/3 for three-crane. The computational result illustrated that the proposed heuristic algorithms can generate robust and acceptable solutions quickly.
What problem does this paper attempt to address?