Problems and Countermeasures of Project Settlement Audit
Ke-ning Liu
DOI: https://doi.org/10.2991/ASSSD-18.2018.8
2018-05-01
Abstract:in recent years, the settlement audit of capital construction projects has become the focus of all investment subjects, construction units and construction project cost management departments and consulting units. In this paper, how to correctly understand the characteristics of the project settlement audit, and how to improve the quality of the completion settlement audit of the project is discussed. 1. Characteristics of Project Settlement Audit 1.1 Strong Policy Capital construction has the characteristics of large investment, large scale and long cycle. In order to strengthen the management of the construction funds, and to maximize the benefit of the limited funds, the army has formulated many rules and regulations for the management and use of construction funds. The correct implementation and application of these laws and regulations is the guarantee of good management and good construction funds, and is an important basis for the audit of completion settlement. 1.2 Broad Scope Project completion settlement audit involving both for capital use, exchanges, intermediate settlement movement process, and related to material supply, drawing changes, national policy adjustment, the price is floating, etc. All aspects of each link. In the work, the auditor must be practical and accurate in all aspects of the above mentioned links, and accurately investigate, audit and determine. 1.3 Technical High Project completion settlement audit, to read master of engineering drawings, engineering quantity calculation, the determination of the comprehensive unit price, tax fee, project construction process of engineering and other professional knowledge, to correctly grasp and apply these knowledge, will directly affect the quality of the completion settlement audit. 2. Common Problems in Project Settlement Audit The military spouse insurance system is different from the single insurance guarantee for the active military personnel. It is a kind of security system which includes multiple insurance types. The main contents include the basic living allowance, the old-age insurance and the medical insurance. Among them, the old-age insurance and medical insurance are only established personal account. 2.1 False Reporting of Works The construction engineering quantity is the foundation of the project settlement, and the calculation of the engineering quantity is of great influence on the size of the project settlement amount. There are some infrastructure projects due to the construction of long period or two construction units. This is the phenomenon of confusing engineering boundaries and overlapping projects. In addition, due to the design change, the modified project is calculated, and the original 28 Copyright © 2018, the Authors. Published by Atlantis Press. This is an open access article under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/). Advances in Social Science, Education and Humanities Research (ASSEHR), volume 206 2018 International Conference on Advances in Social Sciences and Sustainable Development (ASSSD 2018)
Business,Engineering