Temperature analysis and prediction for road-rail steel truss cable-stayed bridges based on the structural health monitoring

Wen-ming Zhang,Zhe-hong Zhang,Zhi-wei Wang,Bin Chen
DOI: https://doi.org/10.1016/j.engstruct.2024.118476
IF: 5.582
2024-06-24
Engineering Structures
Abstract:A growing number of road-rail steel truss bridges have been built worldwide in recent years. Due to the complex cross-sectional structure and increasing span length, these main girders are prone to developing uneven temperature fields and significant local thermal effects, which can lead to excessive temperature stresses and structural damage. An accurate assessment of the temperature distribution in road-rail steel truss girders is critical as it aids in the thermal response analysis of the bridge and the structural safety evaluation. The paper analyses the temperature distribution of the road-rail steel truss girder base on the light conditions and the structure of the main girder. A modified method for calculating the effective temperature (ET) and temperature difference (TD) is also proposed. Comparing with the conventional regional weighted averaging method, the modified method improves the accuracy of ET calculation by 20 %. A prediction method based on the long short-term memory (LSTM) network is proposed, which estimates ET and TD for road-rail steel truss girders based on the environment around the bridge. The deep learning-based method improves accuracy by 40 % compared with the conventional linear regression method for ET prediction. Meanwhile, the proposed method alleviates the current lack of prediction methods for TD of road-rail steel truss girders. A detailed analysis of the temperature of a road-rail steel truss bridge is also presented based on the structural health monitoring (SHM) system. A negative vertical temperature difference was observed in the fringe truss. The maximum transverse temperature difference (TTD) was much greater than the maximum vertical temperature difference (VTD). The above features deserve extra attention from bridge designers.
engineering, civil
What problem does this paper attempt to address?