ANALYSIS OF GENERATOR OPERATIONAL EFFECTIVENESS ON MOTOR VESSEL SINAR BINTAN Name of student : Fini

Abstract:This study purposes to explore imbalanced of generator used in Motor Vessel Sinar Bintan. The vessel is installed by three generators, two generators have capacity of 250 KW, and one generator with 100 KW. In vessel operations, mostly two generators are employed for supporting electrical motors for extended equipment in engine room and deck machinery. These generators also installed to support inside and outsides lighting, communication and navigational system, air conditioner and ventilation, galley equipments, sanitation system, container cooler systems, and hazard prevention tools such as fire pumps and bilge. Moreover, 100 KW generator was occasionally operated. The main problem using original generator arrangement the load factor of equipment while loading and unloading was not taken into consideration. This condition often resulting black out over the ship. Equipment load factor data used in this thesis collected from three sources, data issued by PT Dok dan Perkapalan in year of 2007, operational data and BKI classification. Using comparative analysis for utilization of three generators to fulfill electrical supply for all operational conditions in order to maximize vessel performance, the result shows that the main problem of original arrangement was misleading of start power factor especially crane in loading and unloading activities. Based on three alternatives arrangement, the most economic viable solution is obtained by substituting 100 KW generator by 634 KW generator. Keyword : Efficiency Generators, Power Requirement, Load Factor, Black Out
Environmental Science,Engineering
What problem does this paper attempt to address?