Forecast Load Demand in Thermal Power Plant with Machine Learning Algorithm: A Review
Preeti MankeSourabh RungtaSatydharma Bharti1 Rungta College of Engineering & Technology,Bhilai,Chhattisgarh,India2 Computer Science & Engineering,Institute of Technology,Korba,India3 Department of Computer Science & Engineering,Rungta College of Engineering & Technology,Bhilai,Chhattisgarh,India4 Department of Electrical Engineering,Rungta College of Engineering & Technology,Bhilai,Chhattisgarh,IndiaPreeti Manke is pursuing Ph.d at Rungta College of Engineering & Technology,Bhilai,Chhattisgarh,490024,India. Also,he is working as an Associate Professor Computer Science & Engineering,Institute of Technology,Korba,Chhattisgarh,India.Sourabh Rungta is working as a professor in the Department of Computer Science & Engineering,Rungta College of Engineering & Technology,Bhilai,Chhattisgarh,India.Satydharma Bharti is working as a professor in the Department of Electrical Engineering,Rungta College of Engineering & Technology,Bhilai,Chhattisgarh,India.
DOI: https://doi.org/10.1080/15325008.2023.2295963
IF: 1.276
2024-01-10
Electric Power Components and Systems
Abstract:A thermal power plant is valuable in the current energy infrastructure because it provides power and heat to their respective consumers. The electrical industry must operate properly. Several machine learning methods have been developed to reduce the complexity of electric load. This paper reviews various electricity load forecasting models with machine learning methods. The researcher used ML techniques to predict the load demand and outcome before it happened. ML is a branch of artificial intelligence (AI) focused on studying and developing mathematical algorithms for data understanding. It discusses various applications and the most popular techniques for enhancing the performance and accuracy of the models. This review paper will provide an effective solution for load forecasting in thermal power plants by hybrid machine learning methods. For this review, reference papers are selected from 2020 to 2023. This research identifies gaps in current ML applications and predicts future scope and development methods.
engineering, electrical & electronic