Optimal configuration for battery energy storage system assisting thermal unit in primary frequency regulation: A practical application

Yongjun Feng,Yun Zhou,Zhongguang Yang,D. Feng,Hengjie Li,Xingwang Chen,Yang Du,Yipu Li
DOI: https://doi.org/10.1109/CIEEC54735.2022.9846252
2022-05-27
Abstract:Battery energy storage systems (BESS) have gained research interests in assisting thermal units in primary frequency regulation (PFR) due to their extremely fast ramp rate. In most previous works regarding PFR control, BESS is designed to track frequency deviation to the best of its ability, namely strategies of full compensation. Although such strategies try hard to reduce penalty costs, they are not necessarily cost-effective since operation costs are ignored in strategy design. This drives to the idea of deriving an optimal target compensation degree by deciding a tradeoff between operation costs and penalty costs. Therefore, first, we establish an optimal BESS operation strategy assisting thermal units in PFR, featured with an optimized target compensation degree. Then, based on the operation strategy, we investigate the optimal size of BESS to minimize operating costs and penalty costs. Finally, numerical simulations are conducted on a commercially-operating 1000MW thermal unit in Shanghai City, where the penalty costs are calculated according to local PFR assessment rules. Simulation results based on practical data have shown that the proposed methodology offers a viable solution to maximize the economic benefits for thermal units equipped with BESS participating in PFR.
Engineering
What problem does this paper attempt to address?