Controlling the Manufacture of Parts on Order and for Stock by the Gantt Progress Chart

David B. Porter
DOI: https://doi.org/10.1115/1.4059177
1929-01-01
Abstract:Abstract This paper deals with two special applications of the Gantt progress chart in controlling production. The first shows the plan for the manufacture and assembly of parts on an order, and the progress of work in accordance with the plan. The arrangement of parts on this chart follows the natural order in the assembly of the product. The proper relationship of parts to each other and to the whole is made visible by a system of marginal indentations. This makes it possible to show by one line for each part the amount of stock on hand and in process, and the amount of time ahead or behind schedule. It also shows the time of starting work on each operation without the use of additional bars, thus condensing the chart. The second chart is constructed essentially like the first one, but is designed for the case where manufacturing for stock is already in progress; that is, parts are being made both continuously and intermittently for continuous assembly at a uniform rate. This chart is designed to show the current condition of stores and parts in process, and the amount of time behind or ahead of schedule for each part and assembly. The method for laying out the chart is fully explained. The function of such charts is to bring in advance to the attention of the executive those things which require action, and thereby eliminate the necessity of following up after delays have occurred. The charts measure the progress made on the manufacturing program, and in so doing they also serve as measures of executive ability.
What problem does this paper attempt to address?