Analysis of Early Warning Information of Impact Mineral Pressure By Microseismic Monitoring of Cutting Top and Unloading Pressure Along The Air-retained Roadway

Guoqing Yang
DOI: https://doi.org/10.54097/ajst.v8i2.15055
2023-12-11
Academic Journal of Science and Technology
Abstract:Taking the return air lane of 8201 working face of a mine as the research object, statistically analyze the microseismic monitoring and the change of mine pressure data before the occurrence of the impact mine pressure accident in the process of mining back. Summarize the cut top pressure along the empty stay in the case, microseismic monitoring impact pressure early warning information law, as a similar condition of the mine under the impact pressure prevention and control basis. The corresponding prevention and control measures have been proposed and implemented, and good control effects have been achieved. These measures effectively guarantee the safe production of coal seam mining.
What problem does this paper attempt to address?